Monday, 22 July 2019

2020 BMW 128i Coupe (E82) L6-3.0L (N51) Technical Service Bulletin # 090209 Date: 100401




Audio System - RAD2(R) Programming Communication Issues



SI B 09 02 09





Programming/Coding Explanations









April 2010 Technical Service









This Service Information bulletin supersedes SI B09 02 09 dated August 2009. [NEW] designates changes to this revision





SUBJECT





[NEW] RAD2 Programming with ISTA/P - No MOST Communication









MODEL





E82, E88 (1 Series) [NEW] E89 (Z4)









E90, E91, E92, E93 (3 Series)





All vehicles equipped with option 663 (Radio Professional, RAD2) SITUATION





[NEW] When programming a RAD2-equipped vehicle produced from 03/10 on (and earlier produced vehicles with a RAD2 replacement part manufactured from 03/10) with ISTA/P 2.37.1 or later, a message is displayed: "During control module determination, it was ascertained that control modules connected to the MOST ring are not responding", followed by a second message that begins "The gateway GW is likely to be defective ......" The user is then asked to perform a gateway repair. After following the on-screen instructions, the measures plan directs to replace all MOST control modules.









CAUSE





[NEW] The RAD2 GW locks up during identification with ISTA/P 2.37.1 or later, causing no communication on the MOST ring.









[NEW] PROCEDURE





To avoid the situation above, perform the following steps:









^ Only connect an ICOM-A to the vehicle (do not connect an ICOM-B).









^ Ignore the message that tells you that the MOST bus is not connected by selecting the OK button (see attachment).









^ Determine the measures plan.









Depending on the situation, follow 1) or 2) below:









The measures plan shows that MOST modules have to be programmed (see attachment):







^ Hook up the ICOM-B and wait until you have 2 green lights on ICOM-B. Then accept the measures plan. Programming will go through.









The measures plan shows no MOST modules:







^ Accept the measures plan and programming will go through (do not connect the ICOM-B). ATTACHMENTS









image









image









view PDF attachment B090209RAD2_Workaround_ISTAP_2_34_2.